A Productive Day at the Shop!! Praise the Lord.

003

This is an inside view of the first floor of the shop. This wall is the stairs wall.

002

These two framed rooms are the bathroom and the utility room.

004

Dan is working on putting up the sheeting.

 

Ben, working on the outside of the lower level of the shop.

There will be sixteen windows on this shop plus a front door with a porch and a double side door where the pallets of books will be brought in with a pallet jack.

001

A photo of Ben. He has been such a blessing to us.

Dave and I are warming our hands by the little kerosene lantern. We were folding up all the icy tarps that were on the new concrete foundation for a week. The temperatures were about 20 degrees. Brrr!

Dave and I are warming our hands by the little halogen lantern. We were folding up all the icy tarps that were on the new concrete foundation for a week. The temperatures were about 20 degrees. Brrr!

This entry was posted in All, The Shop. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *