Step by Step Progress

P1020484

After work each day, I head over to the land site and stain and varnish the interior doors for the shop. For the interior shop, we bought knotty pine unfinished doors.

P1020486

These are our 8 cathedral windows, which Dave and a helper will be installing at the lodge on Tuesday.

P1020487

The cathedral window in the dining and lounge room of the lodge (it’s a 30′ x20′ room). It will be great to have glass instead of plastic.

 

 

This entry was posted in All, General. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *