Today, the electrical inspection for the rough in electric at the shop will take place. It is the only inspection that the state of Montana requires during the building process. If the inspection passes, we will begin insulation this week and drywall next week. Our hope is to begin painting the walls by the first of March. We’ll be excited to get back to working on the lodge after we move into the shop in April (God willing).