Plumbing and Windows – Progress!!

P1020030

OUR FIRST WINDOW INSTALLED!

P1020027

THE FOUR LOWER BEDROOM WINDOWS NOW IN.

P1020028

Looking from the outside.

P1020031

The rough in plumbing has begun. Lots of pipe which will be hidden in the walls. This is in the laundry room.

P1020032

This is a lead pipe that will go up through the walls into the kitchen.

P1020033

This is the upstairs bathroom off the entrance foyer. Here you can see plumbing for toilet and sink. You can see the stair way outside the room.

P1020035

Drying things out. We removed literally tons of snow from the building.

P1020036

This is where the kitchen sink and dishwasher will go. The window faces North and overlooks the beautiful view.

P1020037

The Great Room vaulted ceiling.

P1020029  P1020034