Shepherd’s Place Lodge is Beginning to Take Shape

001

004

Dave watching the trench being made for the electrical line from the meter to the lodge. Soon, we’ll have live electricity inside!

 

006

Dan and Ben

 

008

010

Dan, busy at the saw

 

chase3

Building the chimney chase.

 

chimney chase 2

 

dan

 

dave-dan

 

sunset

Sunset on Saturday, through the trees.

 

P1010940

South view (see the main entrance on the right) – Wooden double doors are on order

P1010941

This view is the southwest corner.

 

P1010938

View from the East.

P1010946

Inside the Great Room. The vaulted ceiling is 14 feet high.

 

 

This entry was posted in All, The Lodge. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *