Shepherd’s Place Lodge is Beginning to Take Shape

                     

Posted in All, The Lodge | Leave a comment

The Trusses at Shepherd’s Place Are UP!!

Free slideshow design customized with Smilebox

Posted in All, The Lodge | Leave a comment

A Productive Day at the Shop!! Praise the Lord.

 

Posted in All, The Shop | Leave a comment

The Shop Frame is Going Up

Framing on the shop has begun. If all goes according to plans, the framing should take about 7 days, and then the roof. The shop for the publishing ministry sits about 450 feet away from the Shepherd’s lodge. You can … Continue reading

Posted in All, The Shop | Leave a comment

WINTER! And the Cathedral Window Framed Wall is UP!

Last night we got our first 4″ of snow in NW Montana. It’s cold, but it’s beautiful. I love the snow. It must be those Canadian genes of mine. And today the cathedral window framed wall went up. In a … Continue reading

Posted in All, The Lodge | Leave a comment

Top Floor Going Well – This Coming Week Will See Roof Trusses

It was a very productive week last week. 2/3 of the second floor has been framed. Plus, a huge thing – the concrete foundation for the new shop was poured! That framing will begin in about 2 1/2 weeks after … Continue reading

Posted in All, The Lodge | Leave a comment

A Couple Very Productive Days at the Shepherd’s Place – Upstairs Floor and Joists Now On

Posted in All, The Lodge | Leave a comment

First Floor Framing is Done. Praise God!

It took just 5 1/2 days to complete the downstairs framing. Our crew, DC Construction Company, is amazing. Not only are they believers who love the Lord, they do an amazing job. They are making this place sturdy so it … Continue reading