Water, Electric, and Phone Lines Going into the Shepherd’s Place

P1010788During the last two days, our excavation guy has dug out a six foot ditch over 250 feet long. Then the water guy put in a water pipe running from the new well to the lodge. Then they buried the water pipe with three feet of dirt. After that, the electric conduit was laid in the ditch, and tomorrow it will be covered with two feet of dirt. After that, they will lay the telephone cable and bury that. There will also be a six foot ditch dug 200 feet going the opposite way to the new shop site.

This entry was posted in All, The Lodge. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *